|
Still deciding? Get samples of $ !
Order Sample
|
| Usage: | Working Earthing, Earthing System, Lightning Protection Earthing, Protection Earthin |
|---|---|
| Working Voltage: | High Voltage |
| Application: | Earthing System, Lightning Protection Earthing |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fair Price Galvanized Earth Rod is used for the earthing systems of power plant ,transformer station ,tower ,communication station, airport, railway, subway station , high building ,computer room ,petro plant,oil reservoir in the environmental of moist, saline and alkaline ,acid and chemical corrosion mediumenvironmental.

Hot Dipped Galvanized Ground Rod
|
Specification
|
Size (mm)
|
Length (mm)
|
Thickness of copper layer (mm)
|
kg/m
|
|
EP-01
|
12.7
|
1200/1220/1500/1800/2400/2440/2500/3000
|
O.254/0.5/0.8
|
1.00
|
|
EP-02
|
14
|
1.22
|
||
|
EP-03
|
14.2
|
1.25
|
||
|
EP-04
|
15.8
|
1.55
|
||
|
EP-05
|
16
|
1.59
|
||
|
EP-06
|
17.2
|
1.83
|
||
|
EP-07
|
18
|
2.01
|
||
|
EP-08
|
20
|
2.48
|
||
|
EP-09
|
22
|
3.00
|
||
|
EP-10
|
25
|
3.87
|
||
|
EP-11
|
30
|
5.57
|
||
|
EP-12
|
32
|
6.34
|
|
Item No.
|
Copper Thickness (microns)
|
Diameter (mm)
|
Thread
|
Length (mm)
|
Weight (kg)
|
|
EP-01
|
>=254
|
12.7
|
9/16
|
1200
|
1.18
|
|
EP-02
|
>=254
|
12.7
|
9/16
|
1500
|
1.55
|
|
EP-03
|
>=254
|
12.7
|
9/16
|
1800
|
1.76
|
|
EP-04
|
>=254
|
14.2
|
5/8
|
1200
|
1.52
|
|
EP-05
|
>=254
|
14.2
|
5/8
|
1500
|
1.87
|
|
EP-06
|
>=254
|
14.2
|
5/8
|
1800
|
2.29
|
|
EP-07
|
>=254
|
16
|
M18
|
1200
|
1.89
|
|
EP-08
|
>=254
|
16
|
M18
|
1500
|
2.37
|
|
EP-09
|
>=254
|
16
|
M18
|
1800
|
2.84
|
|
EP-10
|
>=254
|
17.2
|
3/4
|
1200
|
2.2
|
|
EP-11
|
>=254
|
17.2
|
3/4
|
1500
|
2.79
|
|
EP-12
|
>=254
|
17.2
|
3/4
|
1800
|
3.28
|
|
EP-13
|
>=254
|
18
|
M20
|
1200
|
2.4
|
|
EP-14
|
>=254
|
18
|
M20
|
1500
|
3
|
|
EP-15
|
>=254
|
20
|
M22
|
1200
|
2.96
|
|
EP-16
|
>=254
|
20
|
M22
|
1500
|
3.7
|
|
ame
|
Material
|
Size
|
|
Earth Rod
|
Stainless Steel 304
|
5/8" Thread*15mm Rod Dia*500mm Length(Top Part Pointed Without Thread &Bottom Part Threaded of Size 5/8")
|
|
Solid Copper
|
5/8" Thread*14.2mm Rod Dia*1000mm Length(Top Part Pointed Without Thread &Bottom Part Threaded of Size 5/8")
|
1.Plasticity of coating:Electric Powertek Company Ltd.
was established on July 28, 2017, and is located at No. 77, East District, Sixian Industrial Zone, West Ring Road Office, Renqiu City, Cangzhou City, Hebei Province, China. Our company is an enterprise that integrates research and development, production, and sales. All our products have been exported to countries such as the USA, Middle East, Europe, Africa, Asia, Australia, New Zealand, South America, and Central America.
We have the most professional domestic and international sales teams. We can provide customers with worry-free services, solve problems through technology, and offer the most satisfactory customer experience. We believe that EP's products comply with ISO, UL, CE, and BS standards and come with product testing reports, ensuring the safety of your next construction project.
1. Q: Do you provide sample service?
A: Yes, we only provide samples and ask for one piece at a time. The freight should be borne by you.
2. Q: Do you support customized services?
A: Yes, we can customize the size and logo according to your needs. Please consult the customer service for the specific minimum order quantity.
3. Q: How is the Design & Engineering?
A: Experienced and skilled team of designers including CAD designers and 3D designers has the capacity to deliver outstanding designs for your project. If you require more complex engineering of structures such as overhead transmission and distribution lines design,we can also provide this service also designer fee .
4. Q: What's the payment term?
A: We accept T/T, L/C, West Union.
5. Q: What's the delivery time?
A: Usually within 7-15 days according to quantities
6. Q: What's the standard of package?
A: Export standard package or special package as the requirement of customers.
7. Q: What kind of product quality your factory offer?
A: Our products with both excellent quality and competitive price. And we offer free sample for your reference.
8. Q: What kind of certificate you have?
A: We have ISO9001:2008